Moravske Branice - Oslavany Track Speed Increase
Hrdlička, Šimon ; Křemen, Tomáš (referee) ; Říha, Tomáš (advisor)
The bachelor's thesis deals with the increase of a track speed in the section Moravske Branice – Oslavany. The thesis attempts to obtain a speed increase by modifying the existing geometric parameters of the track in the scope of the regular maintenance, in some cases even more thorough, yet still not that costly. The assessment of geometric parameters of the track is done according to the standard CSN 73 6360-1. It is also assessed whether the individual railway crossings meet the conditions for the track speed increase. Part of the thesis is also the design of speed for vehicles with a permitted cant deficiency of 130 mm.
|
|
NorthEast segment of Hranice town bypass
Kelča, Petr ; Jakl, Tomáš (referee) ; Všetečka, Martin (advisor)
The aim of this diploma thesis is to elaborate a variant of the technical solution of the Northeast bypass road of the city Hranice and its subsequent comparison with other variant prepared by the company Linio Plan, s.r.o. The main task of the bypass road is the operation of the industrial zone, through which is achieved the relocation of a large part of the transit traffic from the city centre. The basic difference of compared variants is their location to the city, the solution developed by Linio Plan, s.r.o. passes through the industrial zone and the other variant passes outside this zone.
|
| |
|
Speed Increasing for Track Section Bojkovice-Bohuslavice nad Vláří
Ptáček, Jiří ; Hoza, Miroslav (referee) ; Svoboda, Richard (advisor)
This thesis will examine possibilities of increse speed on a railway track section between Bojkovice - Bohuslavice nad Vláří. The increase of speed will examined according to contemporary geometric parameters of the railway track and with proposed changes of geometric parameters of the railway track. The proposed changes cannot profoundly transformate the body of the railway track. In both cases a restriction of speed by level crossing, a track branching ect. will be taken into consideration or will propose changes of these objects.
|
|
Speed increasing for the Havlíčkův Brod - Humpolec railway track
Turoň, Martin ; Maršalík, Jakub (referee) ; Hruzíková, Miroslava (advisor)
The theme of this bachelor´s thesis deals with an increase of the operating speed for the track Havlíčkův Brod – Humpolec. The speed increase is considered for present track geometry parameters which complies with the standard ČSN 73 6360-1. Track geometry parameters changes are designed in places of train speed restrictions and they don’t cause any significant changes in the railway track. Switches and crossings and railway crossings have an influence on the operating speed. The thesis deals with solutions of speed restrictions on the railway crossings.
|
| |
|
Comparison of Open Line Track Procedures of Works
Turoň, Martin ; Wrana, Radim (referee) ; Svoboda, Richard (advisor)
The theme of this diploma thesis deals with comparing technologies of reconstruction of the railway track No. 2 between railway stations Hranice na Morave and Hustopece nad Becvou in km 7,792 393 – 7,967 592 and in km 8,725 000 – 14,988 677. The aim of the thesis is to design several variants for the reconstruction of the substructure and superstructure, and then compare these variants. This thesis deals with technologies with removal of the track length and with technologies without removal of the track length. Part of the thesis is a description of used technologies and machines connected with them.
|
| |
| |
|
Optimization of Skrochovice - Krnov Track Section
Loučka, Filip ; Wrana, Radim (referee) ; Plášek, Otto (advisor)
This thesis deals with design of optimization of the railway track situated between Krnov railway station and Skrochovice railway station. The section starts at km 87.892 at switch point of Krnov railway station and ends at km 90.4 behind the Krnov-Cvilín stop. The main goal of this work is to design geometric parameters of the track, reconstruction of the railway superstructure, restoration of the drainage and to propose a work technology. The work also includes working out of the bill of quantities and if it is possible a proposal of track speed increase. The design of railway crossings structure and the track on the bridge structure at km 90.367 was required.
|